Millgate

W.C. Meek recently commenced a basement renovation in the North York area as the space had not been touched in decades. Extensive demolition was required to remove block interior walls to allow the space to be opened up as a new structural beam was installed. There were extensive signs of mold and water damage which was Phase One of the re-building process. If you find yourself in a similar situation, WCM can assist in the safe removal of debris, mold remediation and extensive waterproofing. See the photos attached.

 

Posted in Blog.

Leave a Reply